Why did the customer contact us?
The customer needed a roof repair.
Solutions provided:
Blow over 5 inches on main attic floor with cellulose.
Blow over 3-4 inches on vaulted ceiling area.
Apply 2 inches of closed cell foam to wood rail at top corner of vaulted ceiling in attic space to air seal.