Job completed for Anthony S.

Why did the customer contact us?

Customer needed new insulation

Solutions provided:

Over vaulted sections (front and rear) blow over the existing insulation with cellulose to reach levels of R38 (adding 4 inches additional). Over flat area of the attic space remove the damaged batted insulation. Air seal any gaps and conduit lines. Insulate the entry door with foam board insulation and install weather stripping. Blow in new cellulose insulation to R38 (10 inches).
On rear left side of the roof remove indicated section of the shingles, plywood, and roof boot. Install one new 3 inch roof boot, plywood, underlayment, and shingles to match existing as best as possible. Will not fully match due to age of the roof.
Before work can begin a hvac technician will need to re install the furnace pipe properly.