February 28th, 2022 | Annadale, VA
Remove all insulation. Sanitize attic with mildew killing, fungus killing bacteria killing and virus killing agents. Install baffles to keep insulation in proper position. Weatherstrip and insulate attic hatch is.
February 22nd, 2022 | Alexandria, VA
Remove damaged shingles from plywood, install new synthetic under laymen. Install new 3 tab shingles, color to be determined.
February 22nd, 2022 | Falls Church, VA
Remove all insulation. Sanitize the entire attic with Stere-Fab. Install baffles to keep insulation in the proper position. Seal all cracks and crevices and penetrations with spray foam insulation, and seal all can lights. Weatherstrip and insulate attic hatch with zipper close cover over ladder. Blow in all new cellulose …
February 11th, 2022 | Great Falls, VA
Both attics have bare spots in multiple areas. Perform blow over to bring it up to current code requirements of R38. Blow over 5 inches of cellulose in both attics. Install light can covers for older non-IC rated cans. Cover LED plates with flexible foil insulation to prevent insulation from entering …
February 07th, 2022 | King George, VA
Remove section of shingles and flashing on frontside of the home indicated by the technician. Check the plywood for damage and replace if damaged. Install new black metal flashing and sealed properly to the tyvek behind the siding. Install new ice/water shield and grey architectural shingles.
February 04th, 2022 | Stafford, VA
n two attic spaces connected to the lofted storage attic, blow in new cellulose insulation to reach levels of R49 (14 inches). Access points will be cut out prior to work performed.
February 03rd, 2022 | Alexandria, VA
Remove all soiled batted installation from attic space. Spray droppings down and remove with debris. Sanitize attic space. Air seal attic space to exclude mice and rodents. Add 14” of blown cellulose to attic space r-49. Add attic tent to pull down steps.
February 03rd, 2022 | Alexandria, VA
Over vaulted sections (front and rear) blow over the existing insulation with cellulose to reach levels of R38 (adding 4 inches additional). Over flat area of the attic space remove the damaged batted insulation. Air seal any gaps and conduit lines. Insulate the entry door with foam board insulation and install …
February 01st, 2022 | Reston, VA
Existing insulation to be removed by a different company prior to summit installing the new insulation. Sterifab to disinfect the entire attic space. Air seal any gaps and conduit lines with spray foam for energy efficiency. Insulate the entry door with foam board and install weather stripping around the entry …
January 28th, 2022 | Springfield, VA
Install baffles at the soffit and around the entry point. Install can light covers over the recess lights. Spray foam fire block around the chimney. Blow in new cellulose insulation over lower attic space only. Cellulose insulation will reach 14 inches in height (R49). Replace attic stairs with new metal stair. …
January 27th, 2022 | Reston, VA
Remove old vapor barrier, batted fiberglass insulation, and old dehumidifiers. Use Sterifab to disinfect and treat for mildew. Install new dimple shield and 16 mil white vapor barrier on the floor of the crawlspace. Run the new vapor barrier six inches up the wall and seam tape to seal. Install R11 …
January 27th, 2022 | Leesburg, VA
2 x 2 attic entry install in closet of master bedroom Insulate at opening entrance (attic entry area) Once drywall is cut and entry is available over bedroom, add blown in cellulose to attic space.
January 26th, 2022 | Alexandria, VA
Demo existing damaged batted insulation. Install unfaced R19 in joist bays. Install Thermax over new batted insulation, secure to framing and seal all seams.
January 26th, 2022 | Stafford, VA
Drill and fill sun room walls with blown in cellulose insulation. Cut hole in sunroom ceiling and add 13 inches of blown in insulation giving the customer an R-value of 49. Drill and fill in lees coring drywall and plug with 1 coat of drywall compound.
January 25th, 2022 | Fredericksburg, VA
Block joist bays at eaves with rigid foam. Apply 2 inches of closed cell foam to underside of roof decking. R13 with complete air seal will be achieved. SES will cover area with plastic sheeting to protect contents of detached garage. At knee wall in root cellar install 10 mil liner. Secure …
Total: 371
Fairfax, Alexandria & Arlington, VA
Summit Environmental Solutions
Phone: 703-520-5868
5 Le Way, Suite 125 Fredericksburg, VA 22406 Licensed, Bonded and Insured.
* restrictions may apply
* restrictions may apply
Copyright © 2024 Summit Environmental Solutions | All rights reserved.